S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer

Product Details
Customization: Available
Application: Power, Electronic, Instrument, Rectifier
Phase: Three
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (24)
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
  • S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
Find Similar Products

Basic Info.

Model NO.
30KVA~10000KVA
Core
Core-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Power Transformer, Distribution Transformer
Frequency Characteristics
Low Frequency
Shape of Core
EE
Brand
Xinhong
Winding Material
Copper or Aluminum
Linking Group
Dyn11 or Yyno
Size & Weight
Varies by Capacity and Design
Product Price
Price Agreed on Actual Model
Transport Package
Packing Crates by Sea
Specification
customizable
Trademark
Xinhong Changes
Origin
Xuzhou, China
HS Code
8504340000
Production Capacity
5000 Sets/Year

Packaging & Delivery

Package Size
1850.00cm * 1400.00cm * 1600.00cm
Package Gross Weight
4150.000kg

Product Description

Product Title: Three-Phase Oil-Immersed Distribution Transformer
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer

Detailed Product Parameters:
nominal
 capacity
high 
voltage side
High voltage 
tap range
low
 voltage side
Connection 
group labeling
No-
load loss
Load Loss
No-load 
current
Short Circuit
 Impedance
30KVA
11KV
10.5KV
10KV
6.3KV
6KV


 
±5
±2×2.5%
0.4KV
0.69KV
Dyn11
Yyn0
100W 630/600W 2.3% 4%
50KVA 130W 910/870W 2.0% 4%
63KVA 150W 1090/1040W 1.9% 4%
80KVA 180W 1310/1250W 1.9% 4%
100KVA 200W 1580/1500W 1.8% 4%
125KVA 240W 1890/1800W 1.7% 4%
160KVA 280W 2310/2200W 1.6% 4%
200KVA 340W 2730/2600W 1.5% 4%
250KVA 400W 3200/3050W 1.4% 4%
315KVA 480W 3830/3650W 1.4% 4%
400KVA 570W 4520/4300W 1.3% 4%
500KVA 680W 5410/5150W 1.2% 4%
630KVA 810W 6200W 1.1% 4.5%
800KVA 960W 7500W 1.0% 4.5%
1000KVA 1150W 10300W 1.0% 4.5%
1250KVA 1360W 12000W 0.9% 4.5%
1600KVA 1640W 14500W 0.8% 4.5%
2000KVA 1960W 19800W 0.8% 5%
2500KVA 2310W 23000W 0.7% 5%
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
Comprehensive Oil-immersed Transformers Product Details:
Oil-immersed transformers represent a pinnacle in power equipment engineering, extensively utilized across power systems for seamless voltage conversion and transmission. These transformers are meticulously crafted to address high current and large capacity requirements in power systems, ensuring unmatched stability and unwavering reliability.
 

Understanding Model Specifications:
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
 

Key Performance Characteristics:

1. Advanced Winding Structure:
The high-voltage winding features a multi-layer cylindrical, continuous or connecting continuous structure, enhancing shock distribution, minimizing magnetic leakage, and offering superior mechanical strength with robust short-circuit resistance.

2. Innovative Iron Core Design:
Utilizing high-quality, cold-rolled grain oriented silicon steel with an expertly crafted full diagonal seam stacking method, the design is engineered to reduce both no-load loss and no-load current.

3. Enhanced Fastening and Anti-loosening Capabilities:
Both the core and windings are secured with reliable fastening measures, including self-locking anti-loosening nuts on high and low voltage leads, with a non-hanging center structure to withstand transportation vibrations. All fastening components are reinforced with nuts to prevent loosening over long-term operations.

4. State-of-the-Art Vacuum Processing:
Coils and cores undergo vacuum drying, while transformer oil is vacuum filtered and injected meticulously, ensuring minimal moisture presence within the transformer.

5. Innovative Oil Tank Design:
Featuring a corrugated sheet with a breathing function, the oil tank adeptly compensates for oil volume fluctuations due to temperature changes, eliminating the need for an oil storage cabinet and consequently reducing the transformer's height.

6. Additional Features that Stand Out:
With a beautiful appearance and compact size, it requires minimal installation space and is the perfect maintenance-free solution.
Widely implemented in power plants, substations, industrial ventures, mining operations, and rural power grids within power distribution systems.
 
Operating Environment and Essential Requirements:
Optimal Ambient Temperature: Typically maintained between -25°C and +40°C.
Maximum Altitude Limit: Should not exceed 1000m for optimal performance.
Maximum Air Humidity: Should not exceed 90% relative humidity (at +25ºC).
Choosing the Right Installation Place: Select an area devoid of corrosive gases and significant dirt for installation.
 

Comprehensive Maintenance and Upkeep Guidelines:
Regular Inspection and Maintenance: Periodic checks on oil level and oil insulation strength are necessary. Prompt transformer oil replacement is required if issues are detected.
Ensuring Stable Operation: To maintain stable transformer operation, it is crucial to prevent overloads, short circuits, and other operational anomalies.
Critical Safety Considerations: Prior to installation, address ventilation and fire prevention, ensuring adherence to technical specifications for correct setup.


S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
Streamlined Order Process:
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
Factory Scene Insights:
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer

Certified Quality Assurance:
S11 Series 10kv-35kv 2000kVA Oil Immersed Power Distribution Transformer
Frequently Asked Questions:
1. Are you a trading company or manufacturer?

With a decade of expertise, Jiangsu Xinhong Electrical Equipment Co., Ltd. excels as a leading factory in the realm of high and low voltage switchgears, substations, transformers, cable distribution boxes, and diverse electrical equipment, including vacuum circuit breakers and load break switches.
Proudly recognized as a premier supplier to the State Grid Corporation of China, our factory stands as a testament to unmatched quality and reliability.
2. Do you accept customized service?
Our bespoke OEM/ODM services allow us to elegantly emblazon your logo on our products. Our dedicated technical and quotation team is poised to craft a bespoke project tailored to your precise drawings and specifications, ensuring complete satisfaction.
3. What is your MOQ?
Our minimum order quantity is just one piece, catering to your specific needs.
4. How long is your delivery lead time?
Delivery timelines are contingent on your specific product requirements and order size. Typically, you can expect your products within 5 to 10 working days.
5. How do you solve quality problems?
Should a quality concern arise, simply provide us with detailed photographs. Our expert technical and quality testing departments will conduct an analysis and deliver a satisfying resolution within 2 days.
6. What are your payment terms?
Our payment terms include a 30% T/T advance payment, with the remaining 70% due before shipment. We also accept Western Union and L/C for your convenience.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier