S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4

Product Details
Customization: Available
Application: Power, Electronic, Instrument, Rectifier
Phase: Three
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (24)
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
  • S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
Find Similar Products

Basic Info.

Model NO.
30KVA~10000KVA
Core
Core-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Power Transformer, Distribution Transformer
Frequency Characteristics
Low Frequency
Shape of Core
EE
Brand
Xinhong
Winding Material
Copper or Aluminum
Linking Group
Dyn11 or Yyno
Size & Weight
Varies by Capacity and Design
Product Price
Price Agreed on Actual Model
Transport Package
Packing Crates by Sea
Specification
customizable
Trademark
Xinhong Changes
Origin
Xuzhou, China
HS Code
8504340000
Production Capacity
5000 Sets/Year

Packaging & Delivery

Package Size
2000.00cm * 1400.00cm * 1700.00cm
Package Gross Weight
4150.000kg

Product Description

Introducing the robust and reliable Three-Phase Oil-Immersed Distribution Transformer-an epitome of engineering excellence designed to meet the demanding requirements of modern power systems.
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4

Product Parameters:
nominal
 capacity
high 
voltage side
High voltage 
tap range
low
 voltage side
Connection 
group labeling
No-
load loss
Load Loss
No-load 
current
Short Circuit
 Impedance
30KVA
11KV
10.5KV
10KV
6.3KV
6KV


 
±5
±2×2.5%
0.4KV
0.69KV
Dyn11
Yyn0
100W 630/600W 2.3% 4%
50KVA 130W 910/870W 2.0% 4%
63KVA 150W 1090/1040W 1.9% 4%
80KVA 180W 1310/1250W 1.9% 4%
100KVA 200W 1580/1500W 1.8% 4%
125KVA 240W 1890/1800W 1.7% 4%
160KVA 280W 2310/2200W 1.6% 4%
200KVA 340W 2730/2600W 1.5% 4%
250KVA 400W 3200/3050W 1.4% 4%
315KVA 480W 3830/3650W 1.4% 4%
400KVA 570W 4520/4300W 1.3% 4%
500KVA 680W 5410/5150W 1.2% 4%
630KVA 810W 6200W 1.1% 4.5%
800KVA 960W 7500W 1.0% 4.5%
1000KVA 1150W 10300W 1.0% 4.5%
1250KVA 1360W 12000W 0.9% 4.5%
1600KVA 1640W 14500W 0.8% 4.5%
2000KVA 1960W 19800W 0.8% 5%
2500KVA 2310W 23000W 0.7% 5%
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
Detailed Insights on Oil-immersed Transformers:
Oil-immersed transformers are pivotal power equipment, extensively utilized in power systems for efficient voltage conversion and seamless power transmission. Engineered to cater to high-current and substantial capacity transformer demands, our transformers epitomize stability and reliability in challenging power system applications.
 

Model Meaning:
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
 

Performance Characteristics:

1. Winding Structure:
Employing a sophisticated multi-layer cylindrical, continuous, or connecting continuous structure for the high-voltage winding, this design enhances shock distribution within the winding, minimizes magnetic leakage, and offers superior mechanical strength and robust short-circuit resistance.

2. Iron Core Design:
The use of premium cold-rolled grain-oriented silicon steel sheets, combined with a full diagonal seam stacking method, significantly reduces both no-load loss and no-load current, elevating energy efficiency.

3. Fastening and Anti-loosening Mechanisms:
Incorporating comprehensive fastening measures for the core and windings, with self-locking anti-loosening nuts on high and low voltage leads, this non-hanging center structure is designed to endure transportation vibrations. All fasteners are equipped with secure nuts, ensuring stability and longevity during extended operations.

4. Vacuum Processing:
Through meticulous vacuum drying of coils and cores, alongside vacuum filtering and injection of transformer oil, our process ensures minimal moisture presence, thereby prolonging the transformer's lifecycle.

5. Oil Tank Design:
Featuring a corrugated sheet oil tank with a built-in breathing function, this design compensates for oil volume changes due to temperature fluctuations, eliminating the need for an oil storage cabinet and reducing the transformer's overall height.

6. Additional Features:
Our transformers boast an elegant appearance and compact size, occupying minimal installation space, positioning them as ideal maintenance-free solutions for diverse applications.
These transformers find extensive use across power plants, substations, industrial and mining enterprises, and rural power grids within power distribution systems.
 
Environmental Conditions and Requirements:
Ambient Temperature: Ideally, the operational temperature should range between -25°C to +40°C.
Altitude Constraints: Installation should occur at altitudes not exceeding 1000 meters.
Air Humidity: Maintain within 90% relative humidity at a temperature of +25ºC.
Installation Environment: Select locations devoid of corrosive gases, with minimal visible pollutants for optimal performance.
 

Maintenance and Upkeep:
Routine Inspection: Conduct regular checks on the oil level and perform oil insulation strength tests. Prompt transformer oil replacement is necessary upon detection of issues.
Stable Operation: Ensuring stable transformer operation involves preventing overloads, short circuits, and other anomalies.
Safety Considerations: Assess ventilation and fire prevention measures prior to installation, adhering to technical specifications for correct setup.


S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
Order Process:
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
Factory Scene:
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4

Certificates:
S11-2500kVA Three-Phase Oil Immersed Power Transformer with 10/0.4
Frequently Asked Questions (FAQ):
1. Are you a trading company or manufacturer?

We are a distinguished factory with a decade of expertise in producing high and low voltage switchgear, substations, transformers, cable distribution boxes, and a variety of electrical equipment, including vacuum circuit breakers and load break switches.
Our factory proudly stands as an exceptional supplier for the esteemed State Grid Corporation of China.
2. Do you accept customized service?
We provide comprehensive OEM/ODM services where we can elegantly imprint your logo on the product. Our expert technical and quotation teams are dedicated to delivering a project that meets your precise drawings and specifications, ensuring complete satisfaction.
3. What is your MOQ?
Our Minimum Order Quantity (MOQ) is just 1 piece.
4. How long is your delivery lead time?
Delivery lead time is dependent on your specific product requirements and order quantity. Typically, we can fulfill orders within 5 to 10 working days.
5. How do you solve quality problems?
To address any quality concerns, please provide detailed photographs of the issues. Our technical and quality testing departments will conduct a thorough analysis, and we promise to provide a satisfactory resolution within 2 days.
6. What are your payment terms?
We require a 30% T/T in advance with the remaining 70% due before shipment. We also accept payments via Western Union and L/C.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier